| Date: |
1-25-2015 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Drilling firewall to fuse brackets |
|
|
Drilled the lower firewall to fuselage brackets, the ones that hold the four AN-3 bolts, to the F-717 longerons. Good edge distance and clearance for the nuts all around. Tweaked the bends and fit for the F-684 gussets and match drilled them to the skin and the F-713s. Not too many parts, but a lot of tuning to get everything right.. |
||