| Date: |
11-9-2013 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Riviting the tanks .. 5 |
|
|
Installed and wet-riveted inboard ribs on both the L and R tanks. The hand squeezer worked best of all the tools. Installed the forward reinforcement brackets. Safety wired the flop tubes Installed the vent fitting on inboard rib. Installed the BNC connectors for the capacitive fuel sensors. |
||