Date:    10-27-2013
Number of Hours:    4.50
Brief Description:    Riveting the tanks .. 4
Sealed the rivet heads on both tanks. Subscribed to the "proseal is cheap" philosophy and worked hard to be sure there was a good bond between the aluminum and the proseal.

Wet installed the left #7 (outer) rib. The rivet squeezer sure does a better job than a gun and bucking bar .. and alot quieter too! Installed the tip stiffener and sealed the shop and mfg rivet heads.