| Date: |
10-26-2013 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Riveting the tanks .. 3 |
|
|
Wet riveted the left tank .. found quite a few folded rivets (10 ish) that needed to be drilled out and replaced. The slippery proseal requires that the alignment of the gun and bucking bar is near perfect. |
||