| Date: |
10-20-2013 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Riveting the tanks .. 1 |
|
|
Finished inboard tank ribs and fixtured; match drilled Match drilled outer tank ribs Formed and flared vent tubes for both tanks Wet riveted left top skin (abt 1hr for riviting ops) |
||