| Date: |
8-18-2013 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Wing rib prep and priming |
|
|
All the ribs for the wing are pre-drilled and ready. Finished deburring of all ribs, wiped them down with acetone, ran them thru AlumniPrep for pre-prime, and then priming with my favorite Stewart Systems EcoPrime. 28 ribs, with 5-6 operatons each sure takes a long time to get them done. Though, there is a big Zen factor and things proceeded quickly. One fail was that a cleco didn't engage a hole but pushed the rib sideways at the rear spar, making one of the drillings quite ugly. This is a do-over; I don't wanna event to try to salvage. |
||