| Date: |
12-23-2012 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
HS completion |
|
|
Built a tool to push the flang back into position for the installition of the pop rivets. I was able to inert a stick that pushed on the flange on one end and the forward spar on the other… making the hypotenuse of a triange between the rib and the forward spar, at a small angle between the the stick and the rib. This was pushed into positon, held in with a long stick and wedge in the open area between the HS halves, then the rivet was popped. Worked great .. and didn't have to remove the skin to fix ! HS complete! 38.3 hrs" |
||