Date:    4-23-2012
Number of Hours:    6.80
Brief Description:    Empanege and Fuselage - Flight Controls
Attached flaperon pushrod assemblies.

Attached flaperon torque arms.

Fabricated and installed fork assembly.

Installed detent bracket and flap knob.

Fabricated spacers and riveted them to the flaperon torque tubes.

Fabricated rudder cable links.

Pulled rudder cables and set rudder pedal rigging stops.

Secured rudder cables to rudder horn.