Date:    8-9-2012
Number of Hours:    8.50
Brief Description:    Engine installation
Filled groove formed by radius around radiator with high temp RTV.

Installed oil tank and water bottle.

Installed input/output radiator hoses and overflow bottle hose.

Modified and installed firewall grommet.

Installed cabin heat cable.