| Date: |
2-9-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Wiring |
|
|
I installed the firewall pass throughs and ran the wiring through them. I extended the wires for the OAT and mounted it. I extended the wires for the fuel flow sender and wired it. I installed pem nuts in the center well of the fuselage for adel clamps to secure the wiring going through the well so it does not interfer with the control tube. |
||