Date:    10-31-2007
Number of Hours:    16.00
Brief Description:    Firewall forward
Today is Halloween so I hope that no goblins show up:) We installed the baffles and began to cut them down to size. Jeff located the oil cooler and I cut and fit all the pieces and then riveted everything together.

I worked on the fuel lines inside the cockpit.