| Date: |
10-1-2007 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Build and install battery box and heater box |
|
|
Lennie is coming on Tuesday so all the holes and things behind the engine must be done today!! I built and mounted the battery box and heater control box. I drilled the prop, mixture and throttle cable holes. I drilled and prepared the starter solenoid and master soleniod stiffener and plate nuts. Lennie and I will have to rivet these before mounting the engine. Installed engine mount. |
||