| Date: |
8-17-2006 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fabricate elevator push rods |
|
|
Time to fabricate the elevator control rods and bell crank. I cut the tubing to length and deburred. Layed out rivets, drilled, deburred and installed.Sanded and primed rods. Fitted up bell crank, deburred and sanded. I have received the two part epoxy primer so this will one of the first parts painted with it. I have put the rattle cans aside. |
||