| Date: |
6-24-2006 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Mount control surfaces |
|
|
Mounted elevators to horizontal stabilizer. Drilled control horns and my hand:( Note to self; watch those 12 inch long drill bits. They can reach out and grab you. Filling in the open holes takes awhile. I saw several RV's at Sun n Fun were the builder didn't bother. Yuk, looked terrible. Balsa makes a good form for the fiberglas. |
||