| Date: |
5-26-2008 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Getting wings ready to go on |
|
|
I drilled the front wing support and installed the plate nuts. I installed 2 cockpit eye ball lights to illuminate the breakers and switches. I fabricated bracket for flap position sensor and mounted the flap position sensor. I then installed the aileron push tubes. The wing is ready to go on permanently!! I then worked on the gear fairings. |
||