Date:    9-29-2010
Number of Hours:    1.00
Brief Description:    Riveting on rubber seal
I began riveting the rubber seal to the baffles. I had finished the port side and was a few rivets into the back portion when the pop rivet squuzer "blew" apart, with internal parts flying around. I located two of the parts but the third part is still missing.