| Date: |
4-12-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Almost finished with the riveting |
|
|
Completed all the riveting, including installing the brace for the oil cooler section......except for one rivet on the front ramp. I will probably use a pop rivet for that one. I had to remove several rivets from the oil cooler doubler because they were installed with the flat side on the outside. I used pop rivets with flush heads on the inside against the engine. I opened all the holes in the back side and back bulkhead pieces thate take 1/4 fasteners, to 17/64 per directions. I will do the same to the front sections. While drilling out a rive the drill pushed through the rivet hole and into my finger behind it. It hit the nail and caused a tiny amount of bleeding. |
||