| Date: |
3-14-2010 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fabricated and clecoed pieces on front |
|
|
I spent 6 hours in the shop today. I did not realize the time until Martza came in and told me that it was time to go to Richard and Gail Adams for dinner. I fabricated the pieces that are made of angle that is included in the baffle kit. I determined how they go together although there is still a bit of a mystery as to the small piece on the #10 inlet ramp. The pieces are clecoed in place. I also looked over the side and rear pieces that are temporarily installed and trimmed in a couple of areas where pieces were touching each other or the engine block. I enlarged the hole in the rear baffle (piece 7) where the engine mount nut is located. The purpose of the enlargement is to allow a socket to get around the nut. The instructions specified this enlargement. |
||