Date:    9-29-2012
Number of Hours:    1.50
Brief Description:    flap positioning system drop down tray plate nut
Finished installing the nutplate for the drop down tray that holds the flap positioning system and associated wiring.

I was alone when I installed the rivets that hold the nutplate in place with a rivet gun. The rivets are not perfect but work.