| Date: |
7-31-2012 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
airswtich |
|
|
Drilled holes and installed the air switch to the baggage compartment aft bulkhed, port side. Realized that I need to change the order I placed with Stein today an get differenc connectors to run tubing to the air switch. I could not get the tubing to slip over the barbs on the air switch. |
||