| Date: |
10-27-2006 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
wiring runs |
|
|
Drilled holes in the bulheads on the port side for wiring and pitot tube runs. Ran the wire for the elevator trim and the pitot tube. Identified placement of the aux power outlets. Mickey Coggins website was helpful in determining placement. |
||