| Date: |
2-8-2009 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Positioned and drilled left nose ribs, |
|
|
Today I positioned the first nose rib on the left wing. I began by measuring and marking the cord onto the spar. I then dropped a plum bob from the jig hole on the first nose rib and lined it up. I then clamped and drilled that nose rib. Next, I strung the string from the tip rib to the nose ribs just as I did on the right wing. I then proceeded to place and drill the first 10 ribs. |
||