| Date: |
1-13-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Sanded and fit flap drive assembly. |
|
|
Well, I talked via email to Mark Goldberg about the fit of the drive tube into the bearing, He said the bearing was probably out of round due to the welding and I should just sand the inside until it fit. I looked inside and noticed that there was some "slag" (they actually TIG weld and there's no slag) inside from the penetration. I took the dremel tool to the high spots inside the bearings and Voila! the drive tubes fit like a glove. So I installed the root support and slid the tube in to the outer flap drive support and all is well. It fits and now can be drilled to the spars. |
||