| Date: |
10-12-2008 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Riveting left flap |
|
|
Well, yesterday I got a HEAVY dose of inspiration. The 1st annual upper midwest Bearhawk flyin was held in Medford WI hosted by Dwayne Parkinson. There were actually 2 Bearhawks that flew in, Tom Oatman and Bob Marek (first finished plans built Bearhawk). It was great to meet everyone and to take in the inspiration that is a beautifully done Bearhawk or two! So I finally snuck down to the shop and put in some measly time riveting the left flap. I began doing the flush riveting on the spar/skin area. |
||