Date:    8-29-2007
Number of Hours:    4.00
Brief Description:    Began fitting nose ribs to the flap spars.
Today I cut the flap spars to length. Then I marked the hinge and flap nose rib locations. Next I drilled the flap nose rib attach ribs to the spar. Finally, I placed some "skin simulators" on the edges of the spar flange and drilled a nose rib onto an attach angle. This can be seen in the second picture.

I may have just purchased a temporary road block for the Bearhawk...a 1975 Super Beetle. I'm going to have to do quite a bit of work to it which will probably slow construction on the Bearhawk for a little bit but my goal is to still work for at least 30 minutes each day on things. We'll have to see.