| Date: |
1-15-2011 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Work on the right wing skeleton. |
|
|
Today I finished dimpling the holes on the skeleton with a rivet gun and homemade bucking bar in the places that the squeezer wouldn't fit. Then I drilled out the holes for the fuel tank lines and installed grommets into the holes. Finally, I installed all of the hardware permanently with locktite and nylon locknuts in places like the tank straps, flap and aileron drive supports. |
||