Date:    1-15-2011
Number of Hours:    3.00
Brief Description:    Work on the right wing skeleton.
Today I finished dimpling the holes on the skeleton with a rivet gun and homemade bucking bar in the places that the squeezer wouldn't fit.

Then I drilled out the holes for the fuel tank lines and installed grommets into the holes. Finally, I installed all of the hardware permanently with locktite and nylon locknuts in places like the tank straps, flap and aileron drive supports.