| Date: |
3-13-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Cutting steel for 8' break. |
|
|
This morning, thanks to the 12" of blowing snow, I got to work in the shop. So I finished preping all of the parts needed to make the 8' metal break; now I just need to assemble/weld them. |
||