Date:    2-18-2008
Number of Hours:    1.60
Brief Description:    Installing Header Tank Lines
The inlet header tank line and the drain line were formed and installed. The inlet line has a one way Andair check valve installed. I also wrapped several ines with self healing silicone tape for extra insulation from engine compartment heat.