Date:    10-31-2006
Number of Hours:    3.00
Brief Description:    Front Cable Clamp Assembly
I made the front cable block assembly per the plans from phenolic sheet. It was test fir in place. The 2 parts of the clamp were machined on my miniture milling machine.