| Date: |
7-30-2006 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Right Seat Outer Door Core Work |
|
|
The inside of this last door was filled with blocks of end grain balsa epoxied in place. This makes for an increadibly strong door. |
||