| Date: |
1-1-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Assemble and Fit Landing Gear Control Lever |
|
|
I installed the gear activation lever system. This will have to come out in the future, but I needed to see if it fit correctly. This also included finishing the assembly per the plans as the parts were present, but not assembled before this time. |
||