| Date: |
1-19-2008 |
|
| Number of Hours: |
3.30 |
|
| Brief Description: |
Horiz Stab Attach |
|
|
I leveled, measured, clamped, re-measured, re-leveled, and repeated. Read instructions, looked on line, and repeated first step. Three hours (plus) later I had two holes drilled in the fwd spar of the horiz stab. The inboard holes will need another plan. |
||