| Date: |
1-12-2008 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Landing Gear |
|
|
I drilled the holes in the U-804s and U-806s. Next time I could do it in 1/4th the time. This thinking thing really takes a lot of time! I made the F-635B Spacer for the F-635 Bellcrank Assembly and assembled it and match drilled it. |
||