| Date: |
3-1-2008 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Fuel lines, strobe, elt, |
|
|
Painted the foward bay of the fuse and reinstalled all fuel and vent lines. Also the elt was installed, along with the power supply for the strobes. |
||