| Date: |
1-7-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Drilled steps and fitted skin stiffiners |
|
|
Today we fitted and drilled the stiffiners on the foward side of the top skin. Also the steps have been drilled to the skin and blocks installed |
||