| Date: |
1-9-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Installed steps and prepared the tunnel cover |
|
|
Tonight we riveted the steps on. Next the rear baggage sides were installed. The rear tunnel cover is ready for primer and the baggage floors are primed. |
||