| Date: |
9-8-2005 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Vertical Stabilizer |
|
|
Straightened VS spars and spar doubler. Fluted VS ribs. Clecoed skeleton and match-drilled. The forewardmost holes on the two nose ribs were not prepunched, so I used the holes in the skin to drill through the ribs. Clecoed skin to VS and matchdrilled. |
||