| Date: |
11-28-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Bulkhead F-705 |
|
|
Started by cutting the bulkhead to length, then cutting the doublers to length and trimming them to size. There is a shim/doubler that needed to be fabricated that supports the bulkhead (see photos.) Next I clamped the F-705 B section, the bulkhead and the doublers together to drill to size. After double checking all the rivet hole alignment, I moved on to the seat belt brackets. I finished the first one of four when I finished for the day. |
||