| Date: |
4-29-2014 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Front deck - 04 |
|
|
Today was dedicated to finishing the deck construction so I could start to fit it to the cabin. First I needed to fabricate two flanges where wx stripping is mounted. As this is a tip-up canopy the wx keeps the moisture out of the avionics. After cutting the flutes they fit the curve of the panel. I drilled, deburred and riveted them to the deck frame. |
||