| Date: |
4-15-2014 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Cabin work |
|
|
Started the day by disassemblying the cabin frame, vacuuming the metal shavings and getting everything organized. I primed the cabin frame attaching bracket and while it was drying I touched up the paint inside the aircraft. There were a few dings and scraps that needed attention. While all that dried I went back to the cabin frame. |
||