| Date: |
7-19-2011 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Upper right longeron and splice |
|
|
A successful day of setting up the upper right longeron and splice all drilled out for riveting eventually. On the left hand side I had to add a shim between the splice and the side skin as the rear and forward longerons were not absolutely flush. To get a good fit the shim needed to be sanded/ground down to size. |
||