| Date: |
5-10-2010 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Installing bulkhead skin |
|
|
The installation of the bulkhead skin was fairly straightforward, using tape and a long extrusion I held the sides of the side down firmly to the fuselage and drilled and cleco'd. Nerine assisted by holding a wooden block against the skin while I drilled from inside the fuselage. |
||