| Date: |
6-21-2009 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Installation of Rear Carry Through Spar |
|
|
In this element I drilled the rear spar carry through down to the base of the fuselage and used a wooden jig to ensure that teh rear spar angle was correct prior to making the cut out and installing the rear spar attach points. I was not happy with the structural rigidity of the rear spar carry through and so I replaced it with a thicker material having Alclad at Lanseris bend precisely according to the plans. |
||