Date:    1-15-2012
Number of Hours:    4.00
Brief Description:    First 3 panels joined together
Joined the first set of panels together. These 3 panels are ahead of the 7.5" extension which puts them 7.5" ahead of STA 0. Used resin/epoxy with microballons in the joint and peel ply on the surface.