Date:    3-15-2009
Number of Hours:    3.80
Brief Description:    Installed Bellcrank and Worked Baggage Compartment
A missing bolt I needed to install the elevator bellcrank came in, so I temporarily fitted and installed the bellcrank behind the baggage compartment.

I blind riveted the baggage compartment flooring and rear side covers and installed all the nutplates that were required here after drilling, deburring and dimpling the panels.