Date:    5-16-2008
Number of Hours:    2.40
Brief Description:    Vertical Stab Continued
I match-drilled the skin of the vertical stabilizer to the VS skeleton. I then disassembled everything and deburred all drilled holes in the skin, ribs, spars, etc.