| Date: |
5-16-2008 |
|
| Number of Hours: |
2.40 |
|
| Brief Description: |
Vertical Stab Continued |
|
|
I match-drilled the skin of the vertical stabilizer to the VS skeleton. I then disassembled everything and deburred all drilled holes in the skin, ribs, spars, etc. |
||