| Date: |
8-29-2005 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Left wing construction |
|
|
Worked on setting the wing in the jig tonight and made sure that it was straight and level. Checked for twist with a plumb bob. Lowered the plumb bob to the floor and made a mesurement from the string to the edge of the rear spar. Also drilled the wing walk support plate and started to attach the top skins. |
||