| Date: |
3-2-2009 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Horizontal Stabiliser |
|
|
The first steps. All laid out and followed the manual. Parts all laid out, the ribs fluted, and the spar and rib frame assembled with clecos. |
||