| Date: |
7-20-2019 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Prepped and Primed |
|
|
Forgot to take pics. Added 3/4" conduit hole in all Right Main Wing Ribs per Vans SB. Used scotchbrite to roughen surfaces and then Acetone to clean everything. It took a 2.5 batches of Akzo primer to get it all done (Ribs, Fork, Plates, Rear Spar, Tie Down, Spacers, etc....) It all turned out good. |
||