Date:    7-20-2019
Number of Hours:    6.00
Brief Description:    Prepped and Primed
Forgot to take pics.

Added 3/4" conduit hole in all Right Main Wing Ribs per Vans SB.

Used scotchbrite to roughen surfaces and then Acetone to clean everything. It took a 2.5 batches of Akzo primer to get it all done (Ribs, Fork, Plates, Rear Spar, Tie Down, Spacers, etc....)

It all turned out good.