Date:    10-25-2018
Number of Hours:    7.00
Brief Description:    Began work on the Left Wing
Spent lots of time studying the drawings and reading online trying to figure out how to get started.

Finished reinforcing the Wing Stand

Labeled the Left Main Spar (three times to get it right!

Finished drilling and countersinking all platenut holes on the flanges of the Left Wing Main Spar.

Received the two Yokes (thin and Longeron) from Cleaveland Tool.